Metl-Span 2018 Calendar Showcases Top IMP Projects
Lewisville, TX – Metl-Span is releasing a 2018 calendar to highlight the company’s top 12 insulated metal panel (IMP) projects of the last year.
The Cliff Hangers project in Mooresville, N.C., was voted by Metl-Span employees as the top overall project and was awarded the calendar cover position. Cliff Hangers is a state-of-the-art climbing facility, with everything from speed climbing to introductory classes, yoga studio, fitness area, café and kid’s climbing area.
“Metl-Span IMPs are being specified throughout North America by architects looking for an attractive and durable insulated metal panel,” says Amanda Storer, Brand Manager at Metl-Span. “Our installing customers are doing a great job on buildings that have become their signature projects. We’re very excited to be able to highlight these projects in the 2018 calendar and hope to make this an annual showcase.”
For Cliff Hangers, Metl-Span’s Santa Fe wall panels were specified by Cluck Design Collaborative of Charlotte, N.C., and installed by Baker Roofing of Raleigh, N.C.
Other projects featured in the Metl-Span calendar are the Huntsville Aquatics Center of Huntsville, Ala.; Liberty University of Lynchburg, Va.; Exeter YMCA of Exeter, N.H.; Sirna & Sons Produce of Ravenna, Ohio; Mohawk College of Stoney Creek, Ont.; Streetscape Developments Inc. of Saskatoon, Sask.; NY Film Hub of Syracuse, N.Y.; INIT Transportation of Chesapeake, Va., SORAA of East Syracuse, N.Y.; Atlantic Healthy Foods of Conley, Ga.; and The Ark at JFK Airport, Jamaica, N.Y.
For more detailed information on these projects visit the Metl-Span website. To order a free copy of the calendar, email literature@metlspan.com.
About Metl-Span
Metl-Span,
a Nucor company, manufactures insulated metal wall and roof systems for projects ranging from architectural to cold-storage. To learn more, visit www.metlspan.com.