Republic Helicopters of Santa Fe, Texas, chose pre-engineered metal products from Mid-West Steel Building Company for its 16,000 square foot facility for its looks, durability and economy. Their multi-building campus includes a 4,000 square foot office building attached to a 150’ x 80’ hangar.
The main frames of the project are hot dip galvanized steel; all other is pre-galvanized. Pro Construction was the builder; Genesis was the erector and roof contractor. Republic Helicopters designed and planned the project.