GSSI-October 2024-skscraper
lorin-skyscraper-october-2024

Featured Projects

Projects Home

BAM South

Duranar XL Coatings By PPG Add To Starburst Effect On 32-Story Brooklyn Project

Soaring above Brooklyn’s thriving Fort Greene neighborhood, BAM South is a monument to the growing design possibilities associated with metal architecture and sophisticated design and modeling software.

Designed by Enrique Norten of TEN Arquitectos, the 32-story structure features Reynobond aluminum composite material (ACM) panels by Alcoa Architectural Products (now Arconic Architectural Products) fabricated into pans and finished with Duranar XL fluoropolymer coatings by PPG. Opened in 2017, the mixed-use building is home to 300 apartments and condominiums, retail stores and 50,000 sq. ft. of cultural space hosting tenants such as the Brooklyn Academy of Music Cinemas, Brooklyn Public Library, MoCADA and 651 Arts.

Towering from a transparent, boat-shaped pedestal of glass and metal, the crown jewel of BAM South is a multi-dimensional façade that incorporates 14 intricately designed facets, oriented and installed in a complex combination of tilts, shapes and angles to create distinct starburst patterns on its east and west elevations.

To produce the starburst effects specified by the architect, developer Two Trees Management hired Front Inc., a global firm specializing in façade system design, to create detailed, three-dimensional models of both elevations. The models were then used to generate coordination documents, material quantities, project data and assembly drawings. They also produced the G-code that prefabricator Eastern Exterior Wall Systems (EEWS) fed into its CNC machines to generate the finished ACM that was installed over the panelized wall system.

Model Design, Fabrication And Installation

The main façade system for BAM South is an ACM rainscreen mechanically fastened to panelized light-gauge framing. The rainscreen was painted with Duranar XL coating in a bright silver-metallic finish after field visits revealed it was the best color to highlight the facets and capture changing sky conditions.

Because each ACM panel in the façade is modeled to cantilever at precise angles from the metal stud wall panels – and many incorporate recessed window units tilted plumb to the stud walls – virtually none of the units are fabricated to the same shape or dimension.

The precision used to design, machine and fabricate each element in the starburst elevations was further codified in the labeling and sequencing system Front and EEWS developed to coordinate delivery logistics and panel installation.

Over the course of six months, EEWS erected more than 172,500 sq. ft. of ACM — encompassing 15,653 pans and 1,282 window units in 584 standard panels — on the walls of BAM South. Another 1,750 perforated ACM panels were installed to ventilate 875 packaged terminal air conditioner (PTAC) units.

The installation protocol developed by the two firms required that the panelized ACM be anchored in sequence from the bottom of the façade to the top, and from left to right across its face—a task further complicated by the lack of plumbed column lines, which are commonly used for panel and façade installations.

To resolve that issue, Front and EEWS assigned X, Y and Z coordinates to corresponding points on the building façade and labeled the panels according to where they were to be affixed. The X axis sequenced panels from north-to-south; the Y axis from east-to-west; and the Z axis from bottom-to-top.

Because no single panel could substitute for another, each unit on the two elevations had a unique identifier that every person involved in the project, from the machine shop to the installation crew, had to be able to interpret.

In the end, 117 trailers — including 110 wide-load trailers — were used to ship the panels from EEWS’s fabrication plant in Easton, Pennsylvania, to the job site in Brooklyn, a distance of 85 miles. Amazingly, not a single panel was damaged during the half-year it took to fabricate, ship and erect the façade.

Another novel innovation associated with the BAM South façade is the integrated gasket system that Front and EWSS designed for it. Instead of relying on wet-sealing or caulking to produce a weather seal, the system uses perimeter extrusions with three lines of gaskets to create water-tight joints. The integrity of the system was proven during extensive pressurized-water testing in the laboratory and on the jobsite after the panels were installed. It is expected to provide maintenance-free service throughout the life of the building.

Metal panels and coatings have been on the forefront of building design for decades. While coatings manufacturers continue to add to the library of colors and textures available to architects, the marriage of advanced coatings to sophisticated modeling and fabrication techniques is opening a whole new world of design possibilities.

Nowhere is that more apparent than on Brooklyn’s newest skyscraper. Aesthetically, the purpose of BAM South’s multifaceted façade is to articulate the starburst effect envisioned by its designer; but its most important accomplishment may be blazing a trail for the continued ascendance of coated metal on landmark buildings.

Project Credits...

Architect: TEN Arquitectos

Developer: Two Trees Management

Consultant: Front Inc.

Metal Fabricator: Eastern Exterior Wall Systems (EEWS)

Products: Reynobond® Aluminum Composite Material (ACM), Alcoa Architectural Products (now Arconic Building Products)

PPG Metal Coatings: Duranar® XL Coatings

Photographer: Jill Frederickson/Front Inc.

About PPG

ppg-logoPPG offers coatings used on metal construction products. For more information, visit www.ppgmetalcoatings.com .

^ Back To Top