bpd-skyscraper-december-2024
roof-hugger-skyscraper-december-2024

Featured Projects

Projects Home

Two EE's Winery North Production

Addition To Winery Blends Perfectly With Existing Structure

A 6,500 sq. ft. addition to Two EE's Winery in Huntington, IN was completed in August 2019 by CME Corp., a Varco Pruden Builder located in Fort Wayne, IN. The project was selected as the winner in the Agricultural category of the 2020 Varco Pruden Hall of Fame Awards.

The Two EE's Winery North Production addition features Rigid Frame construction by Varco Pruden Buildings, which was tied into an existing Varco Pruden building. The new space expands wine production at the facility and provides a new indoor/outdoor private event venue.

To create a cohesive architectural flow between the new and existing areas, the existing building façade was refaced with Varco Pruden's ThermalClad insulated metal panels and Dizal Wood Grained Aluminum accent panels to match the material palette of the new addition. Further design cohesiveness was created by extending fenestration and landscaping details derived from the existing building into the design of the new construction.

The project is covered by Varco Pruden's SSR profile roofing formed from unpainted Galvalume-coated steel. Varco Pruden's Panel Rib was also used on the walls.

About Varco Pruden Buildings

VP Buildings logoVarco Pruden Buildings manufactures steel building systems for low-rise commercial and industrial applications. For more information, visit www.varco-pruden.com.

^ Back To Top