bpd-skyscraper-december-2024
roof-hugger-skyscraper-december-2024

Terminix Headquarters

McElroy Metal
www.mcelroymetal.com
info@mcelroymetal.com

In order to consolidate operations previously taking place in separate structures, Terminix decided to construct a new two-story office and warehousing facility on its existing campus in Columbia, SC. Because of the building's high visibility and proximity to Interstate 26, great aesthetics were a must. To elevate the overall design, and also give a nod to the site's original structures, the project's architect incorporated eye-catching panel profiles from McElroy Metal into the look.

“The exterior design expression needed to pay homage to the materials and color palette of the original structures, but in a contemporary and forward-looking way,” says David Sickinger, AIA, LEED AP, at Garvin Design Group of Columbia. “Since the original buildings on this campus used a gray/beige brick and gray metal panels, the intent was to replicate those material selections as a means to provide a link to the past. The building’s architecture was to be much grander in scale and open in terms of the amount of exterior glazing, so the veneer selection provided an opportunity to incorporate a sense of familiarity. However, the scale of the brick and profiles of the metal panels were changed to respond to the larger scale of the new structure.”

Sickinger says the team added black as a contemporary accent to play off the other panel color and the brick.

“It was a challenging job, one that makes you look forward to getting to the jobsite when you wake up in the morning,” says Dale Hutto, Manager for Aqua Seal Manufacturing & Roofing of Cayce, SC. “The toughest part was detailing the transitions between different panel profiles and keep it all watertight. We were careful and it all worked the way it was supposed to.”

Three different wall panel profiles from McElroy were installed on the two-story, 55,800 sq. ft. facility. The front of the building features the 24-gauge MSR Panel (3,665 square feet) in Sherwin-Williams Fluropon PVDF Charcoal, installed vertically, and the 24-gauge Wave Panel (5,597 square feet) in Sherwin-Williams Fluropon PVDF Matte Black, installed horizontally, to break up the brick façade. The MSR Panel combines aesthetics and strength in one bold profile, while the Wave Panel offers smaller ribs for the look of a textured wall design. Both are concealed fastener profiles. The warehouse area of the building features McElroy’s versatile exposed fastener 24-gauge R-Panel (6,392 square feet) in Charcoal.

Aqua Seal also installed 2,712 square feet of longboard soffit in Matte Black and 1,063 square feet of Reynobond ACM.

“Whenever I’m driving down 26, I can see the Terminix building,” Hutto says. “That metal, it’s gorgeous; that’s why it sticks out.”

By all accounts, the project is deemed a success. “The project was a great collaboration between the owner, contractor and design team,” Sickinger says. “It is cliché, but very true in this instance. As a design-build project, all three parties were present and fully involved in all aspects of the decision-making process from the very first meeting.”

About McElroy Metal

McElroy Metal logoSince 1963, McElroy Metal has served the construction industry with quality products and excellent customer service. The employee-owned components manufacturer is headquartered in Bossier City, La., and has 14 manufacturing facilities across the United States. Quality, service and performance have been the cornerstone of McElroy Metal’s business philosophy and have contributed to the success of the company through the years. As a preferred service provider, these values will continue to be at the forefront of McElroy Metal’s model along with a strong focus on the customer. More information can be found at www.mcelroymetal.com.

facebook40    twitter40    pinterest40    linkedin40    youtube40
^ Back To Top