The City of Myrtle Beach was looking for an efficient method of dealing with some moisture and insulation issues at the indoor pool of the Pepper Geddings Recreation Center. Metl-Span’s Mesa insulated metal panel was chosen to solve the problems quickly and cost-effectively.
The original roofing system, with batt insulation and a liner inside the natatorium, was sagging. Mold and mildew had become an issue and condensation had caused some rust to the structure.
“The insulated metal panel system is a complete system, it’s got all three things going on in every panel,” says Michael Walker, AIA, LEED AP, at Tych & Walker of Murrells Inlet, S.C. “The interior panel was coated with a product that is resistant to chlorine. It’s an all-in-one product, the interior panel, the six-inches of insulation to get the R-value we wanted and the standing seam metal roofing. It made all the difference in the world.”
The Pepper Geddings natatorium roof also included an impact resistant skylight system over the 25-yard, six-lane pool. Walker says another natatorium in the area is dealing with the same kind of issues and will be solving the problem with the Mesa panel.
Spann Roofing & Sheet Metal of Conway, S.C., installed more than 9,000 square feet of Metl-Span’s Mesa panel, an insulated metal panel with a 6-inch urethane core. The outer face was 22-gauge Galvalume, custom color SR Pre-weathered Galvalume. The outer panel featured a flurothane coastal finish to better stand up to the salty sea air as the facility is about a mile from the Atlantic Ocean. Panels were 30 inches wide with a 22-gauge Galvalume interior face, coated SR Igloo White. Panels varied in length up to 45 feet.
“This was the first time we’ve ever installed an insulated metal roof panel,” says Jimbo Spann, project manager and estimator for Spann Roofing & Sheet Metal. “We just don’t see a lot of applications like this around here. It was pretty straight forward and Metl-Span did a good job of taking us through the shop drawings.”
Spann says the job was under a deadline to get the pool open in time for summer vacation. His crews were onsite for about four weeks and wrapped up in April 2015. “It was a tight schedule and it was challenging working above a pool, just logistical things you don’t have on other jobs,” Spann says. “Plus, before we could install roofing, the general contractor had to add some steel to the existing structure.”
Spann Roofing also installed 180 feet of gutters, coated to match the insulated metal roof panels.