bpd-august-2026-skyscraper

 

2026-media-kit-skyscraper

Featured Projects

Projects Home

Posted: Sep 22, 2022

Zibi Block 211

Zibi Block 211 is an eight-story “state-of-the-art, Class A office project” in Ottawa, Ontario, Canada. Alucoil’s larcore® panels played a significant role in the success of the project, helping the architect “perfectly achieve the expression we were looking for.”

Posted: Jan 02, 2013

Zion Crossroads Health Clinic

The construction of the new Zion Crossroads Health Clinic in Zion Crossroads, VA was completed in May 2012. The two-phased process involved the construction of a core building, two-story ambulatory healthcare shell, general practice clinic, radiology/imaging area and an outpatient surgery center. The facility’s design strikes a balance between traditional and contemporary, with ALPOLIC aluminum composite material from Mitsubishi Plastics Composites America Inc. helping to convey the latter.

Posted: May 14, 2014

ZipCity

C. Tucker Cope & Associates Inc., American Buildings Company (ABC) Authorized Builder, used a metal building system to complete ZipCity™, an 18,000 square-foot facility in Streetsboro, Ohio that contains what is described as the first indoor zip line and trampoline park in the world.

Posted: Jun 24, 2019

Zoller Inc. Headquarters

Zoller Inc.’s headquarters in Ann Arbor, MI, achieved the company's distinct, corporate-branded façade by relying on CENTRIA Formawall®’s ingenuity and customization. CENTRIA, a leading building envelope science company, provided approximately 24,500 square feet of Formawall high performance building envelope system for the 44,000 square-foot building.

^ Back To Top